This bathroom had not been used for over 20 years. It was used for
storage for many years. The most severe issue was the termite
infection from the past. After removing the drywall and looking at
all aspects/issues of termite damage I decided to replace some of
the framing and exterior siding. After completing the outside
siding I decided to replace the siding for the complete home
(removed the asbestos siding and updated it). Once the siding and
framing was completed, flooring was replaced and updated to
AdvanTech Flooring (via
Grant Mason, Construction Hot Springs Arkansas 501-538-1029).
The next step was to install new wiring and circuitry. Complete
new wiring ( pull and install ) and circuit breaker. New updated
ceiling exhaust fan and light assembly also added at this time.
Click on the Steps above to view the restoration of the bathroom.
I have attempted to detail this as much as possible. Updating
(4/22/2021) will continue until completion. Wish you the best,
take care and enjoy LIFE!